METAL PIPELINE FOR DRY SAND TRANSPORT
A rigid three-inch steel pipeline (DN80/PN10) with unified flanges and interposed gaskets, complete with fastening bolts (activation points of 1/2" will be placed every 4 meters). The pipeline effectively connects the three propellers to the three compartments of the internal hopper.
Contact us to find out more or to request a custom quote.